The Dragon's Head Blog: International Center Florida Construction Update for March 11, 2016
There has been lots of activity in the southeast wing of the A building (the Fenway Hotel). This wing has had the roof dried-in. This refers to the process of applying a layer of roofing paper, tar and a thick rubber material to waterproof the roof. The final roofing material layer for all of the wings will be placed at a later date.
Plumbers started installing drain pipes.
Electricians have begun running wires.
Framing and strapping is almost complete.
Window installers have started on the southeast wing as well. This wing should be the first completed.
On the northeast side of the building the second floor joists were completed and the load bearing walls are being framed.
The new elevator shaft in the lobby is being framed.
The new support column for the lobby was completed.
Do check back for more updates on the progress of this new center for practicing Taoist Tai Chi™ arts.